Donghua Chain assists the opening of the northern section of Hangzhou Metro Line 9
On September 17, the northern section of the first phase of Hangzhou Metro Line 9, supported by Donghua Chain, was officially put into operation. So far, the "Metro Era" has begun in the northern area of Linping Mountain. During the operation of this section of the line, the escalator chain provided by Donghua provides power for the traffic connecting the south and north of Linping Mountain. With the support of rail transit, the traffic in the northern part of Linping is more smooth.
It is reported that the first phase of Hangzhou Metro Line 9 starts at Guanyintang Station in Shangcheng District and ends at Long’an Station in Linping District. Station. The northern section of the first-phase project of Metro Line 9 starts from south to north at Qiushan Street Station and ends at Long'an Station. They are all underground lines. The trains are in crimson orange, and the vehicles are B-type drum cars. The maximum operating speed is 80km/ h. Compared with the line 1 train, the space is larger and the ride is more comfortable.
In recent years, Donghua has actively participated in the construction of Hangzhou Metro projects by actively participating in bidding. Among them, lines 1, 2, 4, 5, 7 and other lines that have been opened one after another are equipped with Donghua escalator chains. The official opening of the northern section of the first phase of Hangzhou Metro Line 9 has provided more impetus to shorten the distance between Linping District and various urban areas in Hangzhou and to connect the transportation areas south and north of Linping Mountain.










